Skip to content
FlooringMath
Menu

Paver Calculator

Pavers for a patio, walkway or driveway, with everything that goes under and between them: gravel base, bedding sand, polymeric sand, edge restraint, excavation, weight and cost.

Units
1. Area to pave
  1. Subtract a planter, tree ring or fire pit

      Net area: —

    2. Pavers

    Straight courses; only the ends of each row are cut.

    3. Base and sand

    Suggested for this use and soil: 4" compacted.

    4. Prices (optional, for a material cost)

    You need

    Enter the area and a paver size.

    How the paver calculator works

    A paver patio is a layered system, and each layer is calculated on its own terms:

    1. Pavers: area ÷ (paver length + joint) × (paver width + joint), plus waste for the pattern. Pavers with spacer nubs still leave a joint of about 1/16"–3/16".
    2. Gravel base: covers the paving area plus a strip past the edges (6" or the base depth is common practice), so the edge pavers do not sit on the shoulder of the base. Crushed stone shrinks when compacted, so we add 20% to the compacted volume.
    3. Bedding sand: a 1" screeded layer of coarse concrete sand over the paving area, plus 10% for screeding and low spots.
    4. Joint sand: from the real joint volume (area × the share of the surface that is joint × the filled depth, which is the paver thickness minus 1/8"). This is why small pavers need many more bags than large slabs.
    5. Edge restraint: the perimeter minus the edges held by the house or a wall, in 8 ft pieces with a spike about every foot.
    pavers = ⌈ area × 144 ÷ ((L + j)(W + j)) × (1 + waste) ⌉ base (cu yd) = base area × depth(in) ÷ 12 × 1.20 ÷ 27 tons = cu yd × 1.4 sand (cu yd) = area × 1" ÷ 12 × 1.10 ÷ 27 tons = cu yd × 1.35

    Worked example: a 12 × 16 ft patio against the house

    • Area 192 sq ft, 4" × 8" × 2 3/8" pavers, 1/8" joints, 90° herringbone (10%): 192 × 4.297 × 1.10 → 908 pavers.
    • Base 4" compacted, extended 6" past the edges: (17 × 13) sq ft × 4/12 × 1.2 = 88.4 cu ft = 3.27 cu yd ≈ 4.58 tons.
    • Bedding sand 1": 192 × 1/12 × 1.1 = 17.6 cu ft = 0.65 cu yd (36 bags of 0.5 cu ft).
    • Polymeric sand: 4 × 50 lb bags (about 51 sq ft per bag for these joints).
    • Edge restraint: perimeter 56 ft − 16 ft along the house = 40 ft, 5 pieces and 41 spikes.

    Pavers per square foot by size

    PaverPer sq ft (1/8" joint)Per 100 sq ft100 sq ft + 10%
    4" × 8" brick / Holland (2 3/8" thick)4.3430473
    6" × 6"3.84384423
    6" × 9"2.58258284
    6" × 12"1.94194214
    8" × 8"2.18219240
    12" × 12" slab0.9898108
    12" × 24" slab0.495055
    16" × 16" slab0.555661
    24" × 24" slab0.252528

    Base and sand for common patio sizes

    4" × 8" pavers, 10% waste, 4" compacted base extended 6" past the edges, 1" bedding sand.

    PatioPaversBaseBedding sand
    10 × 10 ft (100 sq ft)4731.79 cu yd · 2.5 t0.34 cu yd · 0.46 t
    12 × 12 ft (144 sq ft)6812.5 cu yd · 3.5 t0.49 cu yd · 0.66 t
    12 × 16 ft (192 sq ft)9083.27 cu yd · 4.6 t0.65 cu yd · 0.88 t
    16 × 20 ft (320 sq ft)1,5135.29 cu yd · 7.4 t1.09 cu yd · 1.47 t
    20 × 20 ft (400 sq ft)1,8916.53 cu yd · 9.1 t1.36 cu yd · 1.83 t

    Base depth by use

    UseWell-drained soilClay soil
    Walkway / garden path (foot traffic)4"6"
    Patio (foot traffic, furniture, grill)4"6"
    Residential driveway (cars)8"12"
    Heavy vehicles (RV, trucks)12"16"

    Compacted depths; add about 2" where the ground freezes. These are planning figures from common hardscape practice, not an engineered design: heavy vehicles and soft or wet ground need a site-specific base. More in how deep a paver base should be.

    Densities vary by quarry: crushed base usually weighs 1.3–1.5 tons per cubic yard and concrete sand 1.3–1.4. Ask the yard for their figure and order a little extra: running short halfway through compaction costs a second delivery fee.

    Frequently asked questions

    How do I calculate how many pavers I need?

    Multiply length × width to get square feet, then multiply by the pavers per square foot for your size (144 ÷ the area of one paver in square inches, including the joint) and add 5–15% for cuts depending on the pattern. A 4" × 8" paver is 4.5 per sq ft without joints, about 4.3 with 1/8" joints.

    How many pavers do I need for a 20×20 patio?

    A 20 ft × 20 ft patio is 400 sq ft. With 1/8" joints and 10% waste that is about 1,891 pavers of 4" × 8", or 431 slabs of 12" × 12". It also needs roughly 6.5 cu yd of gravel base (4" compacted, extended 6" past the edges) and 1.36 cu yd of bedding sand.

    How much should a 20×20 paver patio cost?

    With our default assumptions (concrete pavers, 4" base, professional installation) a 400 sq ft patio comes to about $5,423–$11,623, typically around $7,683. Labor is most of it. Use the paver installation cost calculator with your local prices.

    How much is 1,000 square feet of pavers?

    Installed, roughly $13,439 to $28,939 for concrete pavers on a patio base with our default rates (about $19.09 per sq ft typical). The pavers alone at $3–$8 per sq ft are $3,000–$8,000 plus 10% for cuts.

    How much extra paver should I order?

    Plan 5% for running bond, stack bond or basketweave on a straight-edged area, 10% for 90° herringbone and 15% for 45° herringbone. Add 5% for curves and circles. Keep a few spare pavers from the same run to repair stains or cracks later.

    How deep should the gravel base be?

    About 4" compacted for walkways and patios on well-drained soil, 6" on clay, and 8"–12" for driveways. Add a couple of inches where the ground freezes. Place and compact it in 2"–4" layers. See paver base depth.

    Do I need edge restraint?

    Yes, on every edge that is not held by a wall, a curb or the house. Without it the outer pavers creep outward and the joints open. Plastic or aluminum edging is spiked into the base about every 12".

    How many pavers are on a pallet?

    It depends on the product: a pallet usually covers about 80–150 sq ft. Enter the coverage per pallet from your supplier and the calculator counts whole pallets.

    Last reviewed November 22, 2026. How we check our math: About FlooringMath.