How to calculate paver base
base area = paving area grown by the extension on every side
loose cu yd = base area (sq ft) × depth (in) ÷ 12 × (1 + compaction) ÷ 27
tons = cu yd × density (≈ 1.4 tons per cu yd) Why grow the area? The edge pavers and the edge restraint spikes need solid base under them, not the sloping shoulder of the trench. Extending the base 6" (or the base depth) past the paving adds more than you might expect on small jobs: a 12 × 20 ft patio grows from 240 to 273 sq ft of base.
Why add for compaction? Delivered crushed stone is loose. A plate compactor squeezes out the air, so you need roughly 15–25% more loose stone than the finished compacted volume. Without this, a "4 inch" base ends up closer to 3.3".
Worked example
A 12 × 20 ft patio on clay (6" base), extended 6" each side: 13 × 21 = 273 sq ft × 6/12 = 136.5 cu ft compacted × 1.2 = 163.8 cu ft = 6.07 cu yd ≈ 8.49 tons. Dig 6" + 1" sand + 2 3/8" paver = 9 3/8" below the finished surface.
Base depth by use
| Use | Well-drained soil | Clay / wet soil |
|---|---|---|
| Walkway / garden path (foot traffic) | 4" | 6" |
| Patio (foot traffic, furniture, grill) | 4" | 6" |
| Residential driveway (cars) | 8" | 12" |
| Heavy vehicles (RV, trucks) | 12" | 16" |
Compacted depths. Add about 2" in freeze-thaw climates. Compact in lifts of 2"–4"; a plate compactor cannot densify a thicker layer in one pass. The full explanation is in paver base depth: patio vs driveway.
Paver base for common sizes
Square areas, base extended 6" on every side, 20% compaction, 1.4 tons per cu yd.
| Paving area | 4" base | 6" base | 8" base |
|---|---|---|---|
| 50 sq ft | 0.97 cu yd · 1.4 t | 1.45 cu yd · 2 t | 1.93 cu yd · 2.7 t |
| 100 sq ft | 1.79 cu yd · 2.5 t | 2.69 cu yd · 3.8 t | 3.59 cu yd · 5 t |
| 150 sq ft | 2.6 cu yd · 3.6 t | 3.9 cu yd · 5.5 t | 5.2 cu yd · 7.3 t |
| 200 sq ft | 3.4 cu yd · 4.8 t | 5.1 cu yd · 7.1 t | 6.79 cu yd · 9.5 t |
| 300 sq ft | 4.97 cu yd · 7 t | 7.46 cu yd · 10.4 t | 9.94 cu yd · 13.9 t |
| 400 sq ft | 6.53 cu yd · 9.1 t | 9.8 cu yd · 13.7 t | 13.07 cu yd · 18.3 t |
| 500 sq ft | 8.08 cu yd · 11.3 t | 12.13 cu yd · 17 t | 16.17 cu yd · 22.6 t |
Bulk yards usually sell in half or quarter cubic yards or by the ton, with a delivery fee. The "Order" figure is rounded up to the next 1/4 cu yd. Next: bedding and polymeric sand.