The layers under a paver
- Subgrade: the native soil, dug to depth and compacted. On clay or wet soil a woven geotextile separates it from the base.
- Base: dense-graded crushed stone (road base, crusher run, 3/4" minus) placed and compacted in 2"–4" lifts. This is the layer that carries the load.
- Bedding sand: 1" of coarse concrete sand, screeded flat, that the pavers settle into.
- Pavers and joint sand, held at the edges by an edge restraint spiked into the base.
Base depth by use and soil
| Use | Well-drained soil | Clay / wet soil | Dig (well-drained) | Dig (clay) |
|---|---|---|---|---|
| Walkway / garden path (foot traffic) | 4" | 6" | 7 3/8" | 9 3/8" |
| Patio (foot traffic, furniture, grill) | 4" | 6" | 7 3/8" | 9 3/8" |
| Residential driveway (cars) | 8" | 12" | 12 1/8" | 16 1/8" |
| Heavy vehicles (RV, trucks) | 12" | 16" | 16 1/8" | 20 1/8" |
Compacted base depths. Add about 2" where the ground freezes, because water in the subgrade expands and lifts a thin base. "Dig" adds 1" of sand and the paver thickness (2 3/8" for patios and walks, 3 1/8" for driveways) for a surface flush with the ground. These are common planning figures used by hardscape installers, not an engineered design: for heavy loads, soft ground or steep slopes, get a site-specific recommendation.
Why deeper on clay and in cold climates
Clay holds water and loses strength when wet, so the base must spread the load over a wider area: a thicker base does that. In freezing climates, water in the ground turns to ice and heaves; a thicker free-draining base keeps water away from the pavers and reduces frost movement. A driveway carries concentrated wheel loads and turning tires, so it needs both a deeper base and thicker pavers.
Two examples
- Patio, 12 × 16 ft on clay: 6" base, extended 6" past the edges, 20% for compaction: 4.91 cu yd ≈ 6.9 tons. Dig about 9 3/8".
- Driveway, 12 × 24 ft, clay, mild climate: 10" base: 12.04 cu yd ≈ 16.9 tons. Dig about 14".
Run your own numbers with the paver base calculator, then the paver sand calculator for the bedding layer. Remember the slope: about 1/4" per foot away from the house (patio slope calculator).
Compaction tips
- Compact the subgrade before placing any stone.
- Place base in lifts of 2"–4" and make several passes with a plate compactor on each lift; slightly damp stone compacts best.
- Check the finished base with a straightedge and string line: fix low spots in the base, never with extra sand.